Traffic Management Permit


All contractors, tenants and ADG Staff must complete this Permit and have it approved before commencing any temporary traffic management within the ADG road precinct. The purpose of this Permits is to ensure that all safety aspects of traffic management have been considered and actioned.


Note: registration is necessary before any work on ADG Leased Area is permitted.

*Please register your business with ADG before proceeding. Please click here to register.

*Workers should complete the Working on Airport induction before proceeding with the application.


Part 1 – Application Details
Applicant's email address

ADG Point of Contact

Part 2 – Description of Works
Browse
Browse
Browse
*Multiple attachments supported

Date and Times of Work

*End date must be after the start date of works.

Browse

Please ensure an after-care TGS is attached to this application.

Browse
Part 3 - Responsibilities and Acknowledgement of Permit Applicant

Although TMPs and TGSs are appraised by ADG authorised person (s) for appropriateness, the applicant remains responsible for actual compliance with AS1742.3, AGTTM and all other relevant standards. ADG, its agent and staff accept no responsibility for liabilities resulting from TMPs or TGSs appraised for appropriateness by ADG, which may be later found to be non-conforming with any relevant standards.

Applicant is responsible for: 

  • All aspects of the site control and safety 

  • Ensuring that the TMP/TGS is designed by an accredited Traffic Management Designer (TMD), and persons setting up or manning traffic control have the relevant traffic control have the relevant traffic management accreditations for Traffic Management Implementer and Traffic Controller 

  • Ensuring all traffic control measures as part of the TMP/TGS are placed and maintained in accordance with the TMP/TGS, relevant standards and guidelines 

  • Conduct initial inspection of the site and ensure regular inspections of the implemented traffic control measures 

  • Monitoring the traffic flow and public behaviour throughout the site and taking action where required to amend the traffic control measures as appropriate following approvals of the Traffic Management Designer and the ADG Permit Approver. 

Draw signature|Type signatureClear
reCAPTCHA

*Please fix the date above.